Railways

ENGINEERING

  • Static and dynamic analysis
  • Comfort analysis
  • Crash analysis
  • Fluyd dynamic simulation
  • Test correlation analysis
railways1
railways2

DESIGN

  • Equipment
  • Structure
  • General system
  • Body
  • Bogie
  • Powerpack
  • Trailer truck
  • Gear motor
  • Components

MANAGEMENT

  • Interface and assistance to suppliers
  • Issuing of technical specifications
  • Vehicle systems functional tests
  • Assistance to production plant
  • Issuing of part list
railways3
railways4

PLATFORM PROJECT – DESIGN

  • Equipment
  • Structure
  • Cabin shell
  • General systems
  • Motor bogie
  • Gear
  • Trailer truck

PLATFORM PROJECT – MANAGEMENT

  • Interface and assistance to suppliers
  • Issuing of technical specifications
  • Vehicle systems functional tests
  • Assistance to production plant
  • Issuing of part list

EXAMPLES

railways5

ETR450 (1984 -1985)

  • Equipment components and assemblies

ETR460 (1993 -1994)

  • Upper body electrical system
  • Truck installation and coupling

ETR 480 (1995 – 1996)

  • Upper body electrical system
  • Trailer interface installation and coupling

ETR S220 FINLAND (1994)

  • Equipment and trimming
  • Heat insulation and soundproofing
  • Body structure

ETR470 CISALPINO (1996)

  • Under body shell and compartment doors
  • Truck interface installation and coupling

ETR PORTOGALLO (1997)

  • Framework and vestibule equipment
  • Coating and compartment doors
  • Equipment of lower internal body
  • Technical assistance at AD Tranz (6 months)

ETR SLOVENIA (1998 – 1999)

  • Equipment and trimming
  • Coating and compartment doors
  • Trailer interface installation and coupling
railways6
railways7